PJ McArdle Bridge

Client Name:

Allegheny County

Location:

Pittsburgh, PA

Time Period:

2010

Overview

This project consisted of the rehabilitation of a 215 foot truss bridge over Norfolk Southern Railroad in the South Side of Pittsburgh. We performed complete replacement of eleven approach spans, modification of existing abutments and pier, stabilization of existing abutments and retaining walls with rock anchors, PA Type 10M barrier, highway lighting, reconstruction of approach roadway, drainage and other miscellaneous construction.

Request A Call

412.276.7199
412.276.0718
100 Ryan Court, Suite 20
Pittsburgh, PA 15205