SR 4009-A11 Babcock Blvd.

Client Name:

PennDOT 11-0

Location:

Pittsburgh, PA – Allegheny County

Time Period:

2017

Overview

Replacement of the bridge superstructure carrying 2 lanes of Babcock Blvd over Girty’s Run utilizing accelerated bridge construction techniques along with other miscellaneous construction.

Request A Call

412.276.7199
412.276.0718
100 Ryan Court, Suite 20
Pittsburgh, PA 15205